Roadside service complex MAYAK

Project description

About the project

We offer you to consider Your participation in the project of PSK BEACON

The project of multifunctional complex of roadside service of transit vehicles is a popular and effective. As an example, we can cite the words of the Chairman of the Board of Avtodor Sergey Kelbah. He is considered on the example of Germany. In this country, the driver and his companions are always assured that by staying, they will be able to obtain the whole set of services. Roadside service Germany includes gas station, service complex, cafes, children's room, shower, and store room for the night. Russia also has only one zone, more or less meet these requirements – this area appeared on the South of the country. However, the hotel complex there is still not working. According to Sergei Kelbah, at the moment, the planned construction of 30 multipurpose zones of the European standard.

The head of the state-owned company separately identified the issue with Parkovacie for drivers of heavy vehicles. He noted that they had to stop building the ranks of their trucks to protect each other. Kelbakh said that for this category of drivers Parking zone even more popular than camping or those who just moved on the machines. The problem becomes even more relevant due to the fact that drivers of heavy vehicles are introduced tachographs, which in European countries has long been common. Thus, truckers can be behind the wheel no more than eight hours, after which the automation turns off the engine. The head of the "Avtodor" noted that it is right, because drivers are tired and it is affecting traffic safety, so they need to stop and rest.

OOO "PBLC" was created as an enterprise which should engage the Parking business at the road crossing the M5 and M7 motorways. It is the location and is unique. The issue of Parking has worked for 2 years. During this time, decorated the land with total area of 21 hectares in the district of p. Abdon (Ufa district Republic of Bashkortostan). Signed rental agreement, was developed and preliminary working draft for 1st place, which includes Parking for 600 cars, a dining room, a sanitary unit and a hotel. Question overnight the trucks we are very understandable from the point of view of financial costs for Parking, as we are confronted with it daily. Currently, if you take the highway St. Petersburg – Ufa on 2230 km. there are only 3 more or less meet modern Parking requirements Parking of business that is paved, the lighting of the Park, for morning and evening toilet, Laundry, shower, etc. (It's a Parking lot "Speed" Tver oblast bypass the town of Vladimir and S. Nikol border of Nizhny Novgorod oblast and Chuvash Republic).

Why Ufa? The average mileage of heavy trucks per day is 500 to 700 km.

Take the route:

  1. SPb – Novy Urengoy (SPb + MSK (Moscow or Kazan) – Ufa – Kurgan, etc.)
  2. Moscow – Novy Urengoy (Moscow – (Moscow or Kazan) – Ufa – Kurgan, etc. that is Ufa falls squarely in the multiplicity of day transition from almost all cities of Russia towards the Urals FD, Siberian FD, far Eastern FD and back.

The number of vehicles passing through this stretch of road is between 45000 to 58000 vehicles per day (including passenger cars – according to the Department of highway Samara-Chelyabinsk).

The LUKOIL gas station, located in the complex on the M5 Abdon, is the second in the system of LUKOIL turnover of Bashkiria.

At present, already built and operates a service center for cars SCANIA(company Alphascan Moscow), the construction of a Parking complex, consisting of Park for heavy machinery, dining room and sanitary block, washing for cars, etc. (For a more detailed understanding of the situation developed as follows: we have signed 6 leases of land 1-2.2 hectares 2-1.2 hectares 3-0.67 ha 4-0.67 ha 5-7.7 hectares 6-7.9 hectares of which of us was assigned the lease rights of 3 parcels of land S=2.2 hectares assigned Alphascan, where he built and operates car dealerships trucks SALE, plots, S=0.67 in the amount of 2 was also assigned to the investors, for which they are collected, building fast food restaurants and left directly to the three phase S=1.2 hectares intended for the merchant, S=7.9 hectares intended for warehouses and S=7.7 ha of the Park, where we have already mounted the frame and cleaning the dining room, put more than 200 road plates and formirovalis check in / out of the complex. All rights of assignment of the lease of land was held through the Federal reserve and registered on a reimbursable basis, with the receipt of money on account of PBLK (total 31млн. RUB). Documented the issue of accession of the complex to the Federal road M5 with the FDA”Rosavtodor”, received the technical specifications on the gas, and the design of the pipeline, obtained technical conditions for the supply of electricity to the site 4 MW(1 mW transformer is mounted and operates in accordance with the signed contract for the supply of electric.energy energy retail company OJSC “Bashkirenergo”), carried out excavation works for the removal of a fertile layer of soil and leveling the entire property, drilled 2 wells with a total debit of more than 300 m3 per day (licence to use subsurface resources feature)

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 33312
Created on: 25.07.2018

Russia, Republic Of Bashkortostan


Project price: 100 000 000

Investments volume: 20 000 000


Stage: Development of existing business


3436 reviews

Contact details of entrepreneur

Rafikov Artur Faatovich

Russia, Republic Of Bashkortostan
Carriage / transport / logistics