Shopping center

" data-yashareLink="https://onlbp.com/projects/p33330/" data-yashareImage="https://onlbp.com/assets/uploads/9/2015-03-27_13-48-55_1.jpg">

Project description

New Shopping Centre "Carpet City" built on the Central city street — Lenin Avenue 8 "A". This is the Central transport artery of the city, in immediate proximity there are stops of all transport types. Nearby are the railway and bus stations. This place connects the new part of the city and its historical part. Located next to the bushing of the largest city-forming enterprise "Plant named after V. A. Degtyarev" form a powerful outflows. For many years this place was located the urban clothing market. In a project with TTS built Stele "Military glory" — a large sanitized area.

Planned construction period: beginning spring 2013, delivery of object in operation – IV quarter of 2015. The total area of the object 10600кв.m.

Number of storeys – 3 floors, 1st level (ground floor).

For shopping centre offers 3 Parking, with a one-time location of more than 170 cars.

What has been done:

1. Received all allowing documents for construction of the shopping center, gpzu, construction Permit.

2. Ransom and the annexation of land (owned 4 047кв.m.)

3. Signed a long term lease with the city administration on land under the guest Parking area 1 128 sq. m.

4. Working with three architects on the development of the concept of the Square of Military Glory – Shopping Center – Parking JSC "Zid".

5. The concept of the shopping center developed by the company "Russian Research Group" (RRG). What should be the TC, who is, name, what kind of tenants to occupy the Mall, what will be the positioning in the market. Specialist company RRG works with our gene. designer.

6. The appearance of the shopping center is developing a Moscow-based company separate from the gene. designer.

7. Received and purchased limits on gas.

8. Obtained technical conditions on gas supply

9. Obtained specifications for gas boiler

10. Obtained specifications for the sewer

11. Received TU for water

12. Received TU for electricity

13. Buying capacity of 1000 kW

The power supply will be under category II.

14. Organized by LLC "Stroysila" and obtained membership in the SRO for the construction of the shopping center.

15. We completed the monolithic works on the construction of the ground floor.

16. Work on the construction of metallokarkas done by 50%

17. Signed a preliminary lease agreement with "McDonald's".

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 33330
Created on: 25.07.2018

Russia, Vladimir oblast, Carpets


Project price: 400 000 000

Investments volume: 200 000 000


Stage: Development of existing business


2791 reviews

Contact details of entrepreneur

Sokolov Aleksey Vadimovich

Russia, Vladimir oblast, Carpets
Trade