Skyway — string transport Unitsky

Project description

Requires investment in a unique project, having no analogues neither in scope nor in technology — string transport Unitsky (STU). STU joined the 10 most attractive investment projects in recognition of the international rankings. This technology is ahead of all transport technology 2-level 10-15 years, in 2006 it was already available to Medvedev on the introduction of this technology, which was not done by the Ministry of transport.

Unitsky string transport is a special automobile on steel wheels, placed on pre-stressed (stretched) strings rails, mounted on supports intermediate and anchor with education spans from 30-40 m up to 1000-1500 m and more. Thanks to high flatness and stiffness requirements string-rail track structure of STU achievable speed of 550 km/HR when moving in the air.

THAT HAS ALREADY BEEN CREATED?

The project and documentation of Maglev trains in the company of the giant Siemens took more than 40 years and more than $ 6 billion. Unicomb and his team a similar (and even more complex work) managed to do for 36 years and just over $ 300 million. While developed not one failure model trains, has found only one customer (the track "Shanghai Airport"), and a new transportation INDUSTRY, including the establishment of a string of flyovers, infrastructure (stations, stations, terms, depot, switches, system administration, etc.), more than 100 models of rail vehicles (urban, high speed, freight, etc.). Transport (quoting Unitsky): "it Has a huge number of documents in support of the Technology and targeted projects signed by the Deputy UN Secretary-General Klaus töpfer, the Presidents of the countries (including Russia), Ministers from many countries, ambassadors, governors, mayors, megacities and cities, and a huge number aired, including on the Central TV channels, a video interview with them. For 36 years, there have been a tremendous amount of work — more than 1000 years of cumulative work KB has registered more than 80 patents, awards received "project of the year the transport branch of Russia" — the diploma of the national public prize "Golden chariot(2009), 2 grant UN(1998. and 2002), 2 gold medals of VVC(1998. and 2002), and more.Dr. Elements of this technology have been tested in the period from 1994. for 2012.: — Scale models 1:15, 1:10, 1:5 — In field trials at the experimental station of the UST in the town of ozyory, Moscow region. — wind tunnel tests in St. Petersburg- In bench and laboratory tests in Minsk and Moscow By the way, now available for pre-sale contracts and agreements worth more than $ 10 billion (for example, on the route "Moscow-Minsk" in the amount of 2, 2 billion), with customers from 21 countries.

WHAT YOU NEED TO IMPLEMENT?

Was the final stage in the creation of new transport industry — construction certification — demonstration center of the string technologies! The construction of this Centre needs to phase out funding for 3 years for a total amount of 186 million pounds (1 pound = 100). For several reasons, impossible funding only large investors, so Anatoly yunitskiy, it was decided to bring this amount through the sale of shares of small and medium-sized investors.

INVESTMENT CONDITIONS, STAGES

At different stages of the project implementation will have different terms of sale of the shares. The total value of allocated shares 136 244 899 367 £ (of paid-up share capital in pounds sterling). The preliminary stages and conditions of sales: 1) 0 − 1 million £: discount 1/1000; 2) 1 − 6 million £: discount 1/500; 3) 6 − 16 million £: discount 1/250 — intermediate key stage(end of preparation of design documentation for serial rail-string transport system with the market value of such documentation for over$ 200 million); 4) 16 − 36 million £: discount 1/100; 5) 36 − 86 million £: discount 1/ 50; 6) 86 186 million £: discount 1/25 — certified and ready to sell cargo, urban and high-speed (up to 500 km/h) STU. 7) from 186 million £ without discount 1/1. Are sales and the construction of the first commercial STU.

Innovative Transport company ЕUROASIAN RAIL #SKYWAY SYSTEMS LTD offers a share (stake at a large discount) at the stage of startup!

☝Transnational Project.

Know-How is protected by UK jurisdiction.

The company is officially registered in London!

The implementation period of the project and the IPO in 2017.

Portfolio pre-orders for more than $ 160 billion.

Stakes from 100 to 100 000 pounds. Can participate both natural legal persons.

‼Discount currently, 200-750%.

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 33562
Created on: 25.07.2018

International project


Project price: 10 000 000 000 000

Investments volume: 100 000


Stage: Development of existing business


2671 reviews

Contact details of entrepreneur

Marchenko Konstantin Yurevich

International project
Carriage / transport / logistics