Mining and processing of carbonate raw materials

Project description

Two programs: 1. Plant for the extraction of building stone (mramorit. limestone), the production and sale of crushed stone (mark from M-600 (fraction 40-70, 20-40) to M-1000 (5-20)). The volume of investments of 200 million rubles resource base — its mine (reserves of 5 million cubic meters). Payback (with allowance for raising funds for the 3-year loan at 15% per annum and with an annual moratorium on the interest and the body) — 2. 5 years. Location — Tula region, 250 km to the SW from Moscow;2. Plant for the extraction of building stone (mramorit. limestone), the production and sale of crushed stone (mark from M-600 (fraction 40-70, 20-40) to M-1000 (5-20)), mineral powders micro powders, nanopowders, paving slabs and bricks (giperpress.) The volume of investments 2, 9 billion rubles. resource base — its mine (reserves of 35 million cubic meters). Payback (with allowance for raising funds on the format of the 10-year loan from 8, 5% per annum and with a 3-year moratorium on body) — 7 years. Location — Tula region, 250 km to the SW from Moscow;

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 33970
Created on: 25.07.2018

Russia, Tula oblast, Suvorov


Project price: 4 100 000 000

Investments volume: 250 000 000


Stage: Business for sale


1388 reviews

Contact details of entrepreneur

Prokhorov Vadim Viktorovich

Russia, Tula oblast, Suvorov
Mining industry