Car wash self-service (our development is based on European prototypes), 6 posts

NOT "portal…

" data-yashareLink="https://onlbp.com/projects/p34384/" data-yashareImage="https://onlbp.com/assets/uploads/11214/5968698696_project.jpg">

Project description

Please read the presentation: it's NOT "washing systems" and NOT "portal washing", and some promising format, actively developing in Russia.

PARTICIPATION OF INVESTOR:
49% share in the business. After two years of operation, the entire object becomes the property of the investor (transfer of shares). Discusses other forms of participation (a smaller share, loan).

"Pessimistic" horizon of return a single object 1, 5-2 years. "Most likely" — 1, 0-1, 5 years

Complex self-service car washes is our own developed based on analogues to European providers (BKF, Ehrle, EuroEkol), which resulted in a significant reduction in the value of the object (in 2-2, 5 times).

Project team with an experienced engineer, circuitry, electrician/electronic engineer, heating engineer, programmer of industrial controllers. There are "friendly" adequate contractor on the construction part.

Launched the first facility in Chelyabinsk (native region) to minimize financial and administrative risk and "break-in" scheme. Today there is an agreement of intent with the Mall to provide space under the sink in the Parking lot with great traffic. The plot is provided with the necessary facilities and communications. It is possible to consider other regions to start.

NOTE INVESTOR:

1. The amount of investment is determined, the estimated "reserves". All the work of outside contractors, purchasing materials, etc. to the extent possible, conduct and document the remaining amount is returned to the investor (on the same terms of a share). When resources are scarce (which is highly unlikely) – put your.

2. Create the LLC, discuss in advance the mechanism of interaction in the course of operating activities (form and timing of management reporting; the degree of autonomy of the Director in decision-making, etc.);

3. The work of washing is almost completely automated. Control of activity of the object is carried out remotely from anywhere in the world online through a web interface that allows the investor to always be aware of the state of the object, to track the revenue, fully to keep "abreast".

4.Please note: excluded any "fraud" with the money: the object is controlled by an industrial controller, each step of all subsystems is written in the "logs" (recorded in memory) Deposit an amount into terminal and pressing the button of water flow, to the state of reagents in the tanks, indicators, flow sensors, water temperature, loading, post, etc. (focus on this, because I know that the main problem of the traditional sinks for the owner is "leftist" and theft).

THAT IS ON TODAY:

1. Designed project for the automation of object is composed of certified equipment specification;

2. The technological scheme of production process of washing with the specification of equipment (water treatment systems: softening, demineralization, reverse osmosis; boiler, high pressure pumps, dispensers, motors, tanks, etc.) produced thermal calculations, identify potential contractors;

3. Developed a technical specification for PLC programming (algorithms of work of washing and various subsystems);

4. Assembled the design and construction documentation for similar facilities (construction and installation of washing stations and technical facilities, communications wiring, floor, organization of the system of underground reservoirs for sewage, etc.);

5. About the site mentioned above. The place is very nice. Object refers to "temporary structures" (no need to obtain a construction permit, to do architectural drawings, to Commission and to comply with the purpose of the site).

MILESTONES IN OBTAINING INVESTMENTS:

1. the conclusion of the contract with the landlord (the state registration) for a period of not less than 5 years with no points on early termination except in accordance with the legislation of the Russian Federation (security issue worked out with a lawyer);

2. Transfer contract for the construction of technical facilities, manufacture of metal washing stations, purchase of necessary materials;

3. Excavation: excavation, installation of tanks, clarifiers, filling floors with Underfloor heating, and conduits for installation of structures; summarizing communications to the facility; Installation of metal structures of the washing station.

4. PLC programming (industrial logic controller) according to the algorithms prescribed in accordance with the technical specifications (developed);

5. Manufacturer of consoles washing stations (control units);

6. Purchase of electronics equipment, control and measuring devices (a project of automation of the washing complex is developed, there is the specification of custom equipment); Assembly of control cabinets;

7. Purchase of production equipment (water treatment systems, tanks, high pressure pumps, motors, boiler, frequency converters, etc.)

8. The location of the production equipment in the technical room, the Assembly in accordance with the technological scheme (developed);

9. Commissioning, testing and commissioning.

The launch date of the object: up to 5 months. since the investments.

When dealing with a real interested person will provide detailed financial operating model of the object, explanatory as starting with the analysis of the market, strengths/weaknesses, etc.

Geographically located in Saint Petersburg.
With real partners prefer personal contact or at distance — Skype.

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 34384
Created on: 25.07.2018

Russia


Project price: 6 500 000

Investments volume: 6 500 000


Stage: Business for sale


1827 reviews

Contact details of entrepreneur

Dmitriy

Russia
Services, Carriage / transport / logistics