The development of the sand pit.

Project description

In krasnoarmeyski region of Volgograd, 7 km from the highway connecting the red army and Kirov districts of the city, is a sand pit in the area-31, 4 hectares. Land has 2 certificate in property belonging to two individuals of ½ to each one and cadastral passport. Data on exploration conducted in 2 013 and 2015, this area is a sandy height of 14 m. the Sand is dry, the faction-medium size. Under it deposits of blue clay with a high content of bischofite, which is very popular in therapeutic and medical institutions. The thickness of the layer of occurrence of clay-1 m. Under the clay layer there is another column of wet sand with a height of 6 m. the Depth of water at the site career - 28-35 m. the Area is not flooded By the most conservative estimates, at the cost of 1 ton sand-50 rbl. the volume of only the upper layer of dry fraction 400-600 million. (low price in the Volgograd region of sand such fraction for cash-70 rubles/t). 5 km away from the quarry there is a railway station, 6 km away is the port of the Volga-don canal, which will allow it to sell sand to other regions at a higher price , In plans of city development has approved the construction of the third longitudinal highway (the bypass). it will be held in 1, 5 -2 km from the quarry. The investment cost of this facility - 20 million rubles in the light of all permits for the extraction and sale of minerals .

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 34954
Created on: 25.07.2018

Russia, Volgograd Oblast, Volgograd


Project price: 25 000 000

Investments volume: 20 000 000


Stage: Project is at development stage


2276 reviews

Contact details of entrepreneur

Fazeev Oleg Anatolevich

Russia, Volgograd Oblast, Volgograd
Mining industry