The Mall , Summer" of the Samara region, Zhigulevsk

" data-yashareLink="https://onlbp.com/projects/p35280/" data-yashareImage="https://onlbp.com/assets/upload/21253/gallery/2016/11/26/gallery_yeyVi4OM2a.JPG">

Project description

Shopping and Entertainment Center "Leto"- Zhigulevsk, prospect Youth, MKR-2. The total cost of about 300-320 million RUB estimates are not yet developed, due to the fact that the dynamics of the exchange rate (the lion's share of costs for the construction of the Mall is defined in the currency-mainly the cost of equipment) makes the process of determining the summary of costs without specific understanding of the volume and time of the start of funding in a waste of time.Purchased 800 kW of electricity.Offer:Willing to discuss any terms of investing, lending, equity participation, the entrance to the business.Yield: rates 2016 In the cinemas enough we work closely with specialists, which experience has identified the indicative fees for each cinema. The construction period of 16 months. The payback period of 5 years.

Below we give a small slice of the current situation:At the moment, the project documentation shopping center "Summer". Received a positive conclusion non-state examination. Conclusion based on the basic document – the town-planning plan of land plot (gpzu). All necessary technical conditions for connection to utility systems of the city. At the moment, work is underway for obtaining a construction permit. Developed the business plan for the construction of the shopping center "Summer".Active work to select subcontractors. By internal tender identified suppliers of ventilation equipment and organization that will carry out the installation of all engineering systems in the building of the Mall.Negotiations with some retailers, both local and Federal level. At the moment there are a number of offers from potential tenants from all over the region, although the marketing component of the implementation process of our project hasn't even started.Negotiations are underway by the Ministry of culture of the Samara region for the support of the project under egidoy the popularization of cinema in the provincial towns. It is working with the Film Fund of the Russian Federation for the purpose of obtaining subsidies for the construction of cinemas.This project is entirely supported by local authorities. It should be noted that the segment-specific — it can't expand its borders - on the boundaries of the reserve "Samarskaya Luka". To understand the situation, attaching the location of land for construction of a shopping center and a new neighborhood.The architecture of the city for the construction of the Mall has allocated land strictly according to the regulations of the city. In fact, the city will be a shopping Mall, which will have a cinema (a full shestibalny ) and a place to entertain children. Free retail space to rent — either.

Market analytics

Profit: from 6 000 000 rubles.per month.

The uniqueness of the project

In Zhigulevsk little commercial space for trading. No leisure. There is no entertainment for children. There is no cinema. The population of approximately 70,000 people. The city has its own specifics — it can't expand, as it is located in the reserve "Samarskaya Luka" and allocated me the land for the shopping center will be one of a kind.

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 35280
Created on: 25.07.2018

Russia, Samara Oblast


Project price: 320 000 000

Investments volume: 320 000 000


Stage: Business for sale


860 reviews

Contact details of entrepreneur

Kalentev Dmitriy Valentinovich

Russia, Samara Oblast
Real estate, Construction, Real estate