Metallurgical industry

Project description

Investments in the amount of RUB 5 billion needed for MODERNIZATION of the PLANT,

purchase of equipment (made in Germany) for the processing of slag and buy 100% of the room .A brief overview of the blade: a Plant built with the purpose of obtaining Nickel by processing of various Nickel ores. In production processes of the plant were used Generische oxidized ore deposits, the ore Kazakhstan and Cuba.During the operation of the mill's accumulated waste products in the form of slag, which is formed technogenic Deposit, referred to as "Room No. 1". The blade is near the plant, at a distance of about 600 m, the area is 970, 023 thousand m 2, maximum blade height — 37 meters, the minimum altitude is 7 m. In "Room No. 1" contains the following amount of slag mass, the Furnace granulated slag — more than 50 million konverternyj slag — more than 6,000 tonnes In the structure of the room is dominated by the furnace slag is a 90, 3 percent. BOF slag with content of Ni 0, 6% is more than 5%, with the content of Ni 1-3% — 2%, Ni content 10-15% — 1, 8%, Ni content of 30-50% — 0, 9%.Furnace slag is a glassy granules, consisting mainly of silicates of the oxide of the metals iron, calcium, magnesium, and Nickel .BOF slag is a solid substance, consisting mainly of silicates of the oxide of the metals iron, calcium, magnesium, and Nickel .In the attached file You will find: chemistry for both slag and photo. For the analysis of slags were selected in different parts of the blade, all material are the same, all the chemical composition coincides with the declared chemical characteristics according to the technology of the plant, the result of imperfect technologies used in 1937-1970., and occasionally permitted marriage in the processing of ores, the room formed production wastes in the form of Converter slag with a higher (not provided by the technological process) content of Nickel and iron.The output of finished product in the form of pure Nickel is 12% (5-6 million tons )at the rate of 10%.The price of ton of Nickel on the London stock exchange in average of 10500$. The plant will be held beginning the 10th month after receipt of the investment in this regard, please provide us with the possibility of a 1 year vacation. From the second year, the annual turnover will amount to 4-5 billion rubles. And by further processing of the slag it is expected to receive between 40-60% of iron, etc., etc. ( to full processing of all volume and further utilisation of the room. 100% Support of the administrative regional level. Detailed information and business plan(available) on request.

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 35329
Created on: 25.07.2018

Russia, Chelyabinsk Oblast


Project price: 56 000 000 000

Investments volume: 5 000 000 000


Stage: Business for sale


1351 reviews

Contact details of entrepreneur

Aksenenko Vladislav Anatolevich

Russia, Chelyabinsk Oblast
Industry, Waste treatment, Mining industry