The project relates to wind energy and is the so-called "green technologies" because it does not create harmful emissions into the environment.
The project envisages the production of standard blocks and modules of the power equipment of the fifth generation, which afterwards will be installed at the consumer in an efficient Autonomous power supply system according to any of the required peak load consumption.
Economic indicators of the project:
1. Investments required — 100 000 000 ( investment can be made by the investor in any convenient form, either in the form of equity, either in the form of credit resources).
2. Profitability of production — not less than 100%
3. Market size — $70 billion a year
4. Competition in this segment of the market — very low
5. The duration of the project is 24 months.
6. The payback period of the project in the first year of production
7. Out of production at the level of $100 million a year for 4 years after the implementation of the project.
The project has performance indicators unattainable for all known analogues. Moreover, the project is fully competitive centralized systems of power supply
Techno-economic features of the project are provided by:
special vortex wind power plants (WEU) that produce cheap electric energy from the kinetic energy of the vortex (the cost of electric power generation on WEU — 0, 0075 €/kWh);
— capacity binary power system in automatic mode to maintain the energy balance, i.e. to produce as much electric energy as is required at the moment to the consumer.
The project is cosmopolitan and can be implemented in any country, as it solves many problems created by contemporary energy .
International project
Project price: 200 000 000
Investments volume: 100 000 000
Stage: Project is at development stage
3060 reviews
Kuznetsov Sergey Nikolaevich