The development of the gold mining company

Project description

Good afternoon, dear Investors. I bring to your attention brief information about our company and a quotation.

Gold mining company is located in the area of Bilibino, Chukotka Autonomous Okrug is developing solutionsyou field stream Cachapoal right tributary of the river great keperveyem. Balance reserves of C1 are 170кг

The company has a different infrastructure, engineering and professional personnel, the necessary earth moving and processing equipment.

To ensure the living conditions of the workers have mobile baths, kitchens, residential mobile homes, freezers, kitchen equipment, glaciers and tunnels.

The number of production staff, including the Director-General is 31 people.

Mining on the results of the industrial of the 2016 season amounted to 18 kg of chemically pure metal. The planned quota for 2017 is 50 kg.

A significant difference between the number of the extracted metal in the 2016 season and a sharp increase in the planned production in 2017, due to the fact that the continuation of all wash the 2016 season was carried out mobilization of equipment and earth moving equipment, the site has not previously been prepared, and rinsing was carried out on a rolling production capacity (machinery and washing appliances). In mind not possible to deliver all washing appliances and equipment in the summer time, the focus was on promising Stripping five blocks with balance reserves of the order of 20 kg. Reserve, in the form of uncovered blocks, guarantees steady implementation of the quota for the season 2017.

To increase the speed of development of the enterprise, ready to use the investors ' funds. You need to attract in January 2017, funds in the amount of 35 million rubles which will be used:

-for the purchase of spare parts -6, 5 million,

-spare parts - 2m.,

-purchase of used vehicles in Bilibino T-500 T20-2m.,

-the purchase of 100 tons of diesel fuel-6, 7m.,

-purchasing Used Bulldozer CHETRA company Model T-35 — 17 8 million

The refund plan until November 30, 2017 in the amount of 42 million annual increase will be 43, 3%. It is also possible to loan in foreign currency.

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 35422
Created on: 25.07.2018

Russia, Chukotka Autonomous Okrug, Bilibino


Project price: 150 000 000

Investments volume: 35 000 000


Stage: Development of existing business


1008 reviews

Contact details of entrepreneur

Andrey Buryik Mikhaylovich

Russia, Chukotka Autonomous Okrug, Bilibino
Mining industry