The location of the Tver area of mass building microdistrict "Youth". The house is planned to build on developed PPT for the quarter with existing infrastructure. In the area walking distance of shops, school, kindergarten, public transport stop.
Parcel 5 742, 00 m2, the land is leased.
Construction of brick houses of variable height (9-10 floors). Is carried out in two stages.
First place – 1 and 2 stages (the construction of a single-section 9-storey building and two-piece 10-storey building.)
Second place – 3 and 4 stages (two-piece construction of two 10-storey buildings).
The total number of apartments – 271эконом class (133 one-bedroom, 64 two-bedroom, 74 two-bedroom).
Total area of apartments sold 15 463 m2.
Residential area of apartments – 7 886 m2.
The project implementation period of 2 years.
The project is in the stage of working documentation.
Gpzu is received.
The technical conditions for connecting the object received.
The cost of the project 520 243, 000.
The planned revenue from 695 835, 000.
The estimated margin of 34 %.
The project proponent has its own production of construction materials.
The amount of investment up to 200, 000, 000. there are various options of investments.
Russia, Tver Oblast, Tver
Project price: 520 243 000
Investments volume: 200 000 000
Stage: Business for sale
1781 reviews
Ilina Natalya Vladimirovna