Selling electricity

Project description

Dear investors we offer you to invest in the construction of mini-CHP on the basis of capacity from 2 MW to 500 MW for natural or liquefied gas.

The advantage of a mini CHP is first and foremost: low cost of generated electricity, heat, and accordingly a rapid return on investment. Consuming an average of 0, 3 cubic meters of gas in the CHP the consumer has the opportunity to obtain 1 kW of electricity and 2 kW of heat per hour while saving a significant amount on the traditional connection to the mains.

CHP has lower fuel consumption and as a result, rapid payback, primarily because of the possibility of obtaining two types of energy. The advantage of CHP is a long service life, and the life cycle of the equipment is 20 - 25 years. CHP is environmentally safe and can be placed directly on objects of power supply. Advantages for investors:

The returns from businesses 85% -95% of the funds for heat and electricity at existing tariffs.

CHP remains the property for a period of 10 years depending on the contract and is a highly liquid asset and generate income with a payback period from 4 to 6 years.

The annual increase in electricity prices ensures a break-even operation of the plant.

With all consumers, and is a stable, promising and developing companies are long-term energy service contracts for the system, DOOM at least 10 years to buy produced by mini-CHP electric and thermal energy, which guarantees a return on investment in the construction of mini-CHP investment and profit.

Projects of small and medium energy require significantly less time and investment than large power stations. This allows you to gain precious time on the construction of the power plant and its commissioning.

Stable, guaranteed long-term profit.

Today, enterprises pay per 1 kW/h. 5, 09, R, after the construction of mini-CHP and commissioning the cost of electricity drops from 5% to 15% for energoportal the payback Period of 4-6 years.The average lifespan of generating equipment to replace 25 years

To date, there are agreements with enterprises in which the power consumption is 80 MW/CH

Additional information

Market analytics

Small energy in today's Russia is approximately 8% of the total installed capacity of power plants in Russia operating in grid and stand-alone. Total annual power generation at these power plants reaches 5% of the output of all power plants in the country.

Of course, what Russia's energy future for the great generation, in the present circumstances small generation can quickly solve the problem of power supply.

In many cases, the use of small isolated generating capacity is economically more justified than the organization of energy supply from major sources.

Even with a sharp improvement in the financing of construction of large generation, small generation will find its own market niche and this niche is quite significant and promising.

In Russia the initiative for developing small energy support. It is preferable to haul the main line, given the vastness of our country, especially since the construction of one kilometer of the main line costs $1 million State Energy low energy almost does, if not to take into account small hydro up to 25 MW installed capacity.

Despite the relative high cost of construction of mini-CHP, small power interested in many companies. This will allow companies to reduce the risks associated with the liberalization of the industry. Despite the fact that all these companies are actively interested in great energy, the building of own capacities is a global trend.

Private, distributed power generation — a topic that deserves attention on many levels: from government to private business. Thus, stakeholders are once again talking about the phenomenon of small energy plays, as it turned out, a huge role in the life of the entire industry.

The uniqueness of the project

construction of mini CHP at their own expense

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 36002
Created on: 25.07.2018

Russia, Rostov Oblast, Rostov-on-don


Project price: 150 000 000

Investments volume: 150 000 000


Stage: Project is at development stage


1159 reviews

Contact details of entrepreneur

Gavrilov Evgeniy Alekseevich

Russia, Rostov Oblast, Rostov-on-don
Power industry