The revival of the village

Project description

According to the national scientific research, development and design-technological Institute of organic fertilizers and peat (VNIPTIOU) in Russia operates more than 1,600 large livestock farms, pig and poultry farms with liquid content. Each cow produces an average of 5 kg of manure, pig — 3 kg, broiler — 100 grams In total each day, the country produced more than 450 thousand tons of manure, manure and sewage, of which almost half not being used. According VNIPTIOU today more than 2 million hectares of land used for manure storage. That is, livestock waste covered an area of nearly half the territory of the Moscow region. This resource represents a real environmental threat instead of work on soil fertility and high yields. The use of alternative energy sources — is a matter not distant future, but today. Availability the production of biogas is almost without equal. Thus there is a wonderful combine "useful with pleasure": the sources of biogas — manure, garbage, organic waste — in other words, what we at any cost want to get rid of. As a result of simple processing, it is possible to obtain a combustible gas with a calorific value of 5,000 kcal/cubic meter. in addition, digestate organic content of biogas plants contain nitrogen, phosphorus, potassium, and trace elements not present in conventional mineral fertilizers. In other words, after purification from microbes these balances represent the perfect fertilizer. The bioreactor with a volume of 60 m3 is capable of producing 50 m3 of biogas per hour and process up to 3 tons of manure daily. The proposed design of the bioreactor has no analogues. The bioreactor is made in the form of a steel tubular container placed horizontally and is divided into three sections, not reaching to the bottom walls of the segments. In the first sector of the bioreactor is a loading hatch through which loading of the biomass in the second sector the fermentation of biomass and using the selected device plays the biogas in the gas tank, and the third section on the end surface is mounted a discharge port for discharging the fermented biomass, wherein the reactor is equipped with heating and horizontal agitator. The stirrer is switched on automatically 4 times a day for 5 minutes. Through the heating system circulates the water for heating (working temperature should be not less than 350C) and then cooling. Water heating is a boiler running on solid and liquid fuel. Operating mode 4 to 6 days. I am ready to build such a reactor and bring it to full perfection. The analogue of such equipment you can find and watch via the Internet, and if necessary, syenite and see the plant in the Krasnodar region.

There are agricultural enterprises are ready to enter into a contract for the provision of sites for the construction of the facility and ensure uninterrupted supply of raw materials, tobish manure.

The full cost of the installation with the installation, commissioning, cost of 15 000 000 rubles (depending on the toppings, except for the mechanics of the entire process you must automate) Plus auxiliary equipment for purification and compression of gas for storage. Plus containers for storage and transportation of liquid complex fertilizers. There is a possibility of increasing the volume of the bioreactor to the possibility of obtaining gas required to operate a diesel generator with a capacity of 350Квт + getting heat to 0.25 Gcal/hour

The output will have

Methane gas 50m3 hour; 1200m3 – day; 36000м3 – month price of gas is about 4 $ /m3 total monthly revenue will be 144000рублей

Fertilizer complex 3тонны/day; 90 ton/month at a price of 7 rubles /kg total per month revenue will total 630 000

Total revenues for the production will be 774000 rubles/month

The cost of maintenance and operation of the facility

The raw material (Manure) 3 tons /day по300 rubles/ton — 27 000 rubles/month, spare Parts, materials, al. Energy -30 000 RUB/month Wages personnel taxes — 100 000 RUB/month

The income of the company before tax of oblezenie will be 617000 rubles/month

Income tax – 13% of the amount of income – 80210 rubles/month

Net profit 536790 rubles/month

The payback period of the project will be— 15000 000 /536790 = 28 months

Piperno 2.5 years

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 36306
Created on: 25.07.2018

Russia, Perm Krai


Project price: 15 000 000

Investments volume: 15 000 000


Stage: Project is at development stage


1198 reviews

Contact details of entrepreneur

Okuntsev Vitaliy Yakovlevich

Russia, Perm Krai
Agriculture