We suggest investors to create a farm for bitcoin mining 5000 Th/s worth 100 million rubles
The location of the farm is planned in the city of Abakan in the room is 2000 sq. m.
The payback period of 1 year. The investors profit of 45 million rubles per year.Now have a valid device 50 Th/s.
(length 160 m width 12m height 15m) as you can see
the place is very much the remaining area will be used for scaling and creation of colocasia and passing places for the miners to rent
The strengths of the project
1 Low rent.
2.Cheap electricity and 2.5 p/kWh and below.
3 Cooperation with the government.
4 Security
5 video Surveillance
6 Insurance
7 has its Own substation.660ква
8 the Cost of data center 4000rub per month NA1 miner For comparison, in Moscow DPC stands for 1 miner
power 1.5 kW 6000 rubles per month
—Assembly and adjustment of machines ;— selection and configuration software obespecheniya management and control over the miners;—the development of a plan of equipment and installation of ventilation systems;— podgotovitsya;— installation;— connection of sistemasoperativo;— garantirovana;
We want You to earn, along with You have earned us!We are guided by the principles of honesty otkrytost.
Most importantly, you start earning from the 1st narabotu our farm.
Company website
Additional information
Market analytics
Russia, Khakassia Republic, Abakan
Project price: 100 000 000
Investments volume: 5 000 000
Stage: Development of existing business
Website: bitmaen.com
664 reviews
Artemev Igor Viktorovich