Good day!The essence of the project: the launch of a plant for the production of gypsum partition blocks from foam concrete of different type of dimension, using new technologies.If you compare the same plants on the quality of the products, the financial investment future line of hundreds, actually a thousand times cheaper than analogues. The launch of this project is 35 million rubles., and the analogy of the plant 1.5bn.RUB. The reason I developed all this new technology is shaping blocks, in which the mixture for the manufacture of blocks remains unchanged (GOST). This technology was successfully tested and is ready for serial production. The line produces high-quality and competitive products, because it is mechanized and automated, thus reducing mash/hours and man/hours. All of these factors directly increase the profitability of the enterprise. Profitability 30%. Payback in 24 months. Mound city lost its manufacturing capacity for the production of building materials ( concrete etc.). The bulk of the construction materials come from neighboring cities — Chelyabinsk, Tyumen, Ekaterinburg. Kurgan has a favorable geographical location, transport logistics in relation to the above cities. I believe that the launch of this line, with its manufactured products, with low cost (quality-price) allows you to enter the market is not only the city of Kurgan, but the Chelyabinsk, Tyumen and Sverdlovsk regions and the Republic of Kazakhstan. This demand for products is guided by the application of new reforms on the program of dilapidated housing, as well as you can apply a Bank guarantee in the construction sector.Writing to You with a proposed investment of funds in the project. I am confident that this project will find its niche in the market, and the products establish itself price and quality. About yourself: Filonov, Vladimir V., 41. the city of Kurgan. Kurgan region Experience 20 years in the field of concrete products for 15 years conducted the enterprise for manufacture of building materials. With respect, Vladimir Filonov
The uniqueness of this project lies in the following: Manufacture of this product is divided into two cycles: the preparation of the mixture and molding products. In this case, the first cycle of leave without changes (according to GOST), and in the second cycle apply new technologies i.e. new forming method ( these products will be no different from products from other manufacturers (either in composition nor in appearance or technical characteristics), but will be several times cheaper. This technology will reduce the energy intensity of production, to lower mash/hours and man/hours., and the price, the quality is competitive.
Russia, Kurgan Oblast, Kurgan
Project price: 35 000 000
Investments volume: 35 000 000
Stage: Business for sale
334 reviews
Filonov Vladimir Valerevich