Production of construction dry mixtures

Project description

We invite partners to cooperate for the project for the construction of a complex for the manufacture of construction dry mixtures (more than 40 types) and foam concrete blocks. Available standard project and technical specialists, base, engineering networks. The project has already been implemented in 6 countries, including 2 plants in the UAE. The technology has been developed, repeatedly implemented and has high economic efficiency. The term for the project is 9 months. The payback period is 18 months in Russia.

Company website: https://www.youtube.com/watch?v=ARMDRV7kTeE

Additional information

The production complex includes the production of general-purpose products: construction adhesives, dry mixes for finishing works, as well as dry mixes for the production of non-autoclaved foam concrete and directly foam concrete blocks and panels. Also, we conduct training on the construction technology «Pioneer», which ensures the production of regular orders from construction companies.

Market analytics

The calculation of the cost of production carried out, will provide on request. Similar projects paid off within 18 months when loading 100 cubic meters. products per day. The demand for block foam blocks and dry mixes has been stable for the last 3 years. From April to November, most of the products are blocks. In the autumn-winter period, dry mixtures and adhesives, putties, and primers are more in demand.

There are no dry mixes of foam concrete with a density of 300 to 1200 kg / cubic meter on the Russian market with a uniform distribution of heavy and light fractions. This allows you to pour floor slabs, walls, flat roofs without the use of heavy construction equipment.

The uniqueness of the project

The construction materials market is rather saturated with offers, but our products have no analogues in Russia in several ways:

1. Low cost of final products due to the use of technology of disintegration of raw materials. This can significantly reduce the cost of expensive components that give the composition the necessary flexibility, adhesion and vitality.

2. The technology provides for non-waste production.

3. Availability of cheap raw materials and labor resources.

4. Low energy costs in the production of mixtures. Unlike autoclaved foam concrete, no heating of the material is required to speed up the modification process.

5. Developed technical solutions and projects. The design stage as such is absent, as the project is typical and repeatedly implemented.

6. The possibility of individual selection of mixtures allows you to take into account the requirements for materials, including for restoration work.

7. Temperature limits of application of materials from -15 to + 45 degrees Celsius.

Monetization sources

At the initial stage, product advertising is presented in large construction holdings and with retailers. Samples are provided, demonstrations of application are carried out for both specialists and workers.

Seminars are held for employees of design organizations and experts.

In Belarus, we carried out work on the standardization of our products and helped produce GOST for foam concrete, which took into account the peculiarities of the manufacture and use of our products.

As experience shows, high quality products, a large range, the possibility of individual production of products with desired properties allows for 1 year to reach full production. All plants previously built by us work around the clock and seven days a week, they ship both in the country of residence and abroad.

Sales strategy and marketing

The location of the production is selected taking into account the transport accessibility of large cities: Tver, Moscow, Yaroslavl, Novgorod.

The cost of production allows dumping without loss of quality and not to the detriment of the payback of the plant. There is an established sales network of dry mixes in the Tver and Moscow regions.

The main buyers are retailers and construction companies. For piece products, high demand is observed in the segment of private construction.

Economic indicators

Invested amounts

At the moment, more than $ 350, 000 has been invested in the project. The bulk of the cost of implementation is the purchase of equipment and construction of buildings. For our part, we are ready to purchase some of the equipment, provide installation and adjustment, training, provide the recipe (protected by a patent), production base and communications.

Payback period (years) 1, 5

Expected net profit per month (highest possible indicator) 235 000

Expected profitability of sales (%) 40

Profitability index of Investments (%) 1 083

Bezhetsk, Tver Region, Russia

Project value: 275843 820

Investments amount: 236437 560

Stage: ready-made project

Website: https://www.youtube.com/watch?v=ARMDRV7kTeE

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 42408
Created on: 18.10.2018

Russia, Tver Oblast, Bezhetsk


Project price: 4 200 000

Investments volume: 3 600 000


Stage: Project is at development stage


Website: https://www.youtube.com/watch?v=ARMDRV7kTeE


332 reviews

Contact details of entrepreneur

Golik Aleksey Mikhaylovich

Russia, Tver Oblast, Bezhetsk
Industry