Participation in the construction of a refinery plant with a capacity of 500,000 tons / year in Nigeria

Project description

Oil refinery with a capacity of 500, 000 tons/year in NIGERIA

The main set of oil refining equipment has been manufactured and is in stock, ready for shipment. The participation of local partners has been agreed and confirmed. We need a co-investor for making one additional node and sending the kit. Investment offer will be provided upon request.

Minimum investment 1, 500, 000 US dollars secured by the equipment of the plant for a minimum period of 9 months.

The project is under the control of the State of Nigeria, under the Foreign Investment Protection Program.

Possible options to choose from: equity participation, borrowed funds

Economic indicators

Invested amounts

Payback period (years) 2

Predicted net profit per month (maximum possible indicator) 5 000 000

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Project No. 44815
Created on: 18.12.2018

Nigeria, Delta staite, Calabar


Project price: 30 000 000

Investments volume: 1 500 000


Stage: Development of existing business


431 reviews

Contact details of entrepreneur

Abramov Vyacheslav Anatolevich

Nigeria, Delta staite, Calabar
Crude oil processing/petrochemicals