Design and construction of neftebitumen plant

Project description

Vietnam does not produce bitumen, purchase on the Singapore exchange.

We propose to build neftebitumen plant with a capacity of 200 (400) thousand tons of bitumen a year from the purchased on the stock exchange of petroleum fuel oil. When it is processed by our developed technology thermoemitting conversion (diesel visbreaking) output bitumen is 20-40% and the yield of expensive diesel-gasoline fractions reaches 60-75%, which ensures high profitability to the enterprise.

The draft had been discussed in Vietnam at various administrative levels. Promising site for the construction of the plant. Recommended to establish an international joint venture"Bitumen Vietnam"

As partners of a joint venture are looking for an investor with funding of 70-120 million$.

Company website

Additional information

Market for road bitumen in Vietnam is met only through imports. The creation of the national neftebitumen industry is confirmed on the government level

Market analytics

The need of the Vietnamese market for bitumen is more than 600 thousand tons per year (for 2017)

The uniqueness of the project

Upon receipt of road bitumen from oil (the cost of which is approximately equal to) technology "diesel visbreaking" is made up of 60-75% of diesel-gasoline fuels, which cost in 2-2, 5 times higher than the original oil, which ensures a quick ROI and high profitability operating Neftebitumen plant

Monetization sources

Consumers of bitumen — road construction firms, for example, "BMT Group Profile", the users of diesel fuel — the Ministry of defence, the consumers of gasoline -workers and private fleet.

Sales strategy and marketing

Bitumen bitumen will be offered to companies of Petrovietnam, diesel fuel and gasoline will be sold through self trading company

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 53197
Created on: 09.09.2019

Vietnam, NGI-Sleep


Project price: 170 000 000

Investments volume: 50 000 000


Stage: Project is at development stage


Website: termakat.ru


575 reviews

Contact details of entrepreneur

Kurochkin Aleksandr Kirillovich

Vietnam, NGI-Sleep
Crude oil processing/petrochemicals