Hello, looking for investor for construction of power plants of 2.5 MW. the investor's financial participation under reporting. after launching and reaching the planned capacity, the percentage of net profits will be 90/10 in favor of the investor until full recoupment of investments, the following conditions are 50/50.
Participate in operational work or to devote time to this project, the investor is not necessary, all efforts will fall on my shoulders, as the experience in stroitelstvu similar structures or putting into commercial operation.
The investor will only receive passive income.
Net profit of the year ~ 800 — 850 thousand $
ROI 3, 5 — 4 years.
Additional information
The project is a cascade hydroelectric power station located on the river, with a drain channel and a water pool upstream. further, tubing of the required diameter the flow of water is directed down the slope (vertical drop 30m ) water pressure actuates turbine.
Market analytics
The wholesale market is currently in need of alternative Green energy. The state has created a program to stimulate this kind of energy ( hydroelectric — tariff preferential 15-18.9 tenge /kW, Solar power plants 35-40 tenge / kWh but is not stable generation and the unpredictable payback of 6 years.)
Uniqueness is not, possible, experience, so why doesn't everyone earn.
non-cash or convenient way for both parties.
Selling of the energy generated will be sold mestome RES. marketing does not need and absent seasonality.
Kazakhstan, The Turkestan region, Shymkent
Project price: 2 800 000
Investments volume: 2 800 000
Stage: Project is at development stage
451 reviews
Kuzmin Sergey Andreevich