The blockchain, bitcoin mining data center.

Project description

Ready platform for the construction of a data center.

The project also included:

1. Technical conditions for connection to El. networks at 63 MVA in the second category (FGC )

2. Construction ПС2х63 MVA 110/10 kV

3. Construction of transformer substation 10/0, 4 kV in the required amount

4. Construction of hangars the necessary area and utilities

5. Land required area

6. The rate of VN with the output on the wholesale power market (2-2, 2 rubles per kWh)

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 57870
Created on: 02.03.2020

Russia, Krasnoyarsk Krai, Krasnoyarsk


Project price: 10 000 000

Investments volume: 10 000 000


Stage: Business for sale


426 reviews

Contact details of entrepreneur

Russia, Krasnoyarsk Krai, Krasnoyarsk
Informational technologies, Power industry