Trust

Project description

I propose the following project:

1.United trust in similar activities:

installation, repair and reconstruction of thermal power plants, ship repair ( repair of the Navy), installation and repair of pipelines,

the restoration of metallurgical equipment ferrous and nonferrous metallurgy(components up to a length of 15 meters and a diameter up to 3 meters);

2.Retraining of welders of argandykov high qualification of passports and diplomas in the field of the above activities, equipment of nuclear power plants, submarines and spacecraft titanium

working in spacesuits in argon chambers under pressure. The resulting documents provide the right to work in all the above activities abroad, including high-tech

enterprises, by mounting the roll on the capacity of 50000 m3 and oxygen plants.

I will be glad to cooperate with You in any favorable light. Train Your representatives. At the moment I have no company, but a team of engineers and specialists there.

The project includes my know-how, which gives considerable savings of money, because to be able to dump the competitors, winning competitions (tenders) and to invite the best specialists of competitors to our high wages.

Only I know the correct accents for maximum financial savings in the combined company and how to perform the work in a smaller cohort of specialists, getting the maximum productivity for each specialist. All work is organized on the principle of artisanal gold mining is to obtain maximum production with minimal energy through the use of know-how. I agree that the investor was the owner of the company, and I hired a Manager. The financial side is controlled by the owner of the company. The purchase of land for the base and the equipment should be confirmed with the owner. My Deputy is appointed by the owner. The first profits will go through the month after conclusion of the contract with the customer. Any payment until receipt of the first tranche, I will not be made.

For the project in the amount:400 000 000 roubles

Changing bureaucratic steering apparatus of the Russian industrial enterprises into a new formation and giving some control to the same types of production processes, we reduce the cost of production.

In the production link interface the following points:

long lathes with lengths up to 15 meters support the restoration of propeller shafts in ship repair, shipbuilding and ferrous metallurgy recovery of rollers of the rolling mills, support rollers hot rotating furnace cement factories tonazha to 30 tons. In this perspective, long the rig will be loaded to the maximum, and so on.

Because on the invested dollar at the end will be $ 10 profit.

Project detailed information is available to investors after authorization.

Project detailed information is available to investors after authorization.

Translated by "Yandex.Translator"
Project No. 59682
Created on: 11.06.2020

Russia, Krasnodar Krai, Taman


Project price: 400 000 000

Investments volume: 400 000 000


Stage: Project is at development stage


541 reviews

Contact details of entrepreneur

Shmurakov Yuliyan Grigorevich

Russia, Krasnodar Krai, Taman
Know how, Industry, Services, Power industry